Carter Kolwey 088eea1e3b Fixes for network calculation issues
This fixes several issues:
* More than one switching station could become active on large networks
 - Switching stations now semi-permanently become disabled if another is present
 - Power monitors have been added to replace the function of "slave" switching stations, to discourage overuse of switching stations
* Networks did not reliably "split" when cutting a cable
 - I "may" have caused this issue, but I believe it is solved by this
* Machines did not run without a player near the switching station
 - Active switching stations now forceload themselves, and free the forceloaded block if disabled, dug, or disconnected
 - Machines are only loaded to run them (as before), so only one mapblock (or two if the bottom edge of the switching station is a mapblock boundary) is loaded
 - Cables are still only loaded during a full network recalculation
2017-03-10 01:35:58 -06:00
ShadowNinja ee0765804c Partial rewrite 2013-09-17 16:37:56 -04:00
RealBadAngel 3bc6cad671 Remove lv, mv, and hv tiers from power tools.
Theyre already tiered with Mk1-3 (at least drill is, more in the future).
Tools can be considered as designed for different tiers of circuits thx to their power needs.
For example Mk3 will require ages to load in LV batbox.
Batboxes load tools timining: LV standard (1000EU), MV 4x faster (4000EU), HV 16x faster (16000EU)
Also since 1EU is the same in any circuit it is possible to move energy from one to another with portable devices like crystals.

Other changes:
- moved charge/discharge functions to battery_boxes_commons.lua
- added UI style backgrounds for all the batboxes
2013-07-17 19:14:01 +02:00
ShadowNinja 5d470cd753 Move files to subfolders 2013-07-11 12:31:00 -04:00