Make hydro generators sense the water flow volume around them

Water flow around a gen is shown more or less directly by the water's
param2, range 0 to 15, so four sides could total 60.  Cap the result to 45
so that three sides' worth of full flow (or four sides at reduced flow) still
registers as "100%", and raise the maximum outpu to 2250 EU.
This commit is contained in:
Vanessa Ezekowitz 2017-02-21 12:34:08 -05:00
parent 8cab1a0aec
commit 4888581bee
1 changed files with 6 additions and 4 deletions

View File

@ -26,10 +26,12 @@ end
local run = function(pos, node)
local meta = minetest.get_meta(pos)
local water_nodes = 0
local water_flow = 0
local lava_nodes = 0
local production_level = 0
local eu_supply = 0
local max_output = 50 * 45 -- four param2's at 15 makes 60, cap it lower for "overload protection"
-- (plus we want the gen to report 100% if three sides have full flow)
local positions = {
{x=pos.x+1, y=pos.y, z=pos.z},
@ -41,12 +43,12 @@ local run = function(pos, node)
for _, p in pairs(positions) do
local check = check_node_around_mill(p)
if check then
water_nodes = water_nodes + 1
water_flow = water_flow + check
end
end
production_level = 25 * water_nodes
eu_supply = 30 * water_nodes
eu_supply = 50 * water_flow
production_level = math.floor(100 * eu_supply / max_output)
if production_level > 0 then
meta:set_int("LV_EU_supply", eu_supply)